Summer is ending, the project is ending, bummer....
Oct 1st
September 2009
21 posts
Sep 30th
Exterior Cladding or Skate Ramp?
After working out the technique and pattern of the screws with the L3Q team we attached one entire side of the paperstone exterior cladding. Nice jet black color eh!? It is called “skateramp.” Each panel is attached to a vertical wood batton creating a rainscreen . Now that we’ve got it all set up and going, and time is almost up, our client Leon may finish up the other sides...
Sep 30th
“Drywall, Sheet Rock, Gypsum Board, Gyp Board, Wallboard, Plasterboard…”
Sep 29th
Sep 29th
“Regular use of the palm-nailer leads to carpenter’s claw!...”
– Nate Blammo!
Sep 28th
Sep 28th
“Insulation!”
Sep 27th
Sep 27th
“Tar Paper!”
Sep 21st
Sep 21st
Sep 12th
“Beer Friday!”
– For the purpose of toasting framing-punch-list-mode, and showing off the project to friends. (With beautiful summer weather in September!)
Sep 12th
Sep 12th
Sep 12th
“We are in framing punch-list mode.”
– Jake Blammo!
Sep 11th
Week 10
The team returned this week well rested and ready to build America. With the help of some selective beard trimming Jake tripled his speed, strength and enthusiasm by channeling the spirit animal of marvel superhero Wolverine. Nate defied gravity by surfing SIP panels up a ramp and through the second story window. Travis muscled his way into Blammo history by transforming into the Human Crane and...
Sep 5th
Sep 4th
August 2009
9 posts
“Insert two week summer vacation here. With Jake in Texas then Minnesota and...”
Aug 14th
Aug 13th
Aug 13th
“Raising Hammers”
– Today we raised hammers to toast the setting of the last beam which represents the end of basic framing on the project. Tomorrow we “raise the roof,” literally. Way to go Blammo!
Aug 13th
Aug 12th
Aug 10th
Week 8, Second Floor Walls, Columns
A very exciting week indeed. After raising the second floor walls (office + kitchen and bath), Blammo! jacked up the south side of the building and tipped-in the steel columns. The building is really taking shape now, sweet.
Aug 10th
“You mean I can stand under the building and it won’t fall on me?”
– Lauren (our client) after the steel columns went in.
Aug 10th
Aug 10th
July 2009
11 posts
Week 7, Beams, Stairs, Second Floor
Despite the record breaking heat wave, we made good headway this week. Beams were placed, stair stringers were hung, and the second floor joists and platform went in without a hitch. Whew, what a week man. Proper farmer tans are definitely taking shape!
Jul 31st
Jul 31st
“Hot, Hot, Heat = 103 degrees!”
– The hottest day in Seattle’s history and the Blammo brothers kept it going on the jobsite with the addition of a sun shade tarp and plenty of icey liquids. “Ain’t nothin’ gonna break’ ah my stride…”
Jul 29th
Jul 24th
Week 6, From Concrete to Wood.
This week we transitioned from concrete to wood and Travis Blammo! stepped into his framing outfit—cowboy hat included. The first walls went up in the art studio and there was great enthusiasm all around.
Jul 24th
“Just a reminder, when all the material has been moved, cut, moved, hammered,...”
– Jake Blammo!
Jul 21st
“Concrete!”
Jul 21st
WatchWatch
Jul 21st
Jul 21st
Jul 17th
Jul 12th
June 2009
14 posts
“Once we finish with the concrete and start framing I can pull out my nice...”
– Travis Blammo!
Jun 30th
Jun 29th
Building America!
Today, we powered through most of the remaining steel tying and formwork construction in preparation for the big concrete pour later this week. Travis contributed a tiny USA flag to the project and Nate summited the dirt pile laying claim to the peak for the glory of building America. Go Blammo! Go.
Jun 29th
Jun 27th
Jun 26th
“Just like shims, Blammo! has thousands of uses.”
– Nate Blammo!
Jun 26th